Installation; Protective Equipotential Bonding/Earthing - oventrop 1344596 Notice D'utilisation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Flush-mounted cabinet
6.

Installation

A wall recess with a depth of 110 mm is
sufficient for the installation of the flush-
mounted cabinet with the dwelling station
"Regudis W-HTE" and its accessories.
For better access, the depth of the wall recess
should not be dimensioned too small.
The flush-mounted cabinet can be pulled out
to a depth of 175 mm.
6.1
Installation
1. Remove the door of the flush-mounted cabinet.
2. Remove the frame of the flush-mounted cabinet.
3. Adjust the feet of the flush-mounted cabinet to the
required height. Observe the height of the screed
when adjusting the feet. The screed surface should
be at least 1 cm above the lower edge of the plinth.
A height marking will appear when extending the
feet (see Illustr. 7 auf Seite 19). The dimensions
on the height marking indicate the distance
between the floor and the lower edge of the plinth.
Adjust the feet by loosening the wing nuts and fix
them by tightening the wing nuts.
Illustr. 7: Height marking
4. Position the flush-mounted cabinet in the provided
wall recess.
5. Fix the cabinet at the feet and the fixing brackets
(see Illustr. 1 auf Seite 16 (2) and Illustr. 2 auf
Seite 17 (2)).
Bend the fixing bracket to obtain the correct
position.
134459780-V04.04.2019
Illustr. 8: Fixing bracket at the flush-mounted cabinet
6. Install the dwelling station and its accessories into
the flush-mounted cabinet. Observe the operating
instructions of the different components.
7. Refit the door and the frame of the flush-mounted
cabinet after having covered or plastered the wall.
You can use the cardboard for the protection of
the door during the construction phase.
6.2
Protective equipotential bonding/
Earthing
DANGER
Danger to life due to electric current!
Danger to life due to contact with live
components.
f Completely disconnect the station from
the power supply and protect it against
accidental restart.
f Check that no voltage is present.
f The electrical connection must only be
carried out by a qualified electrician.
Before commissioning of the installation, the flush-
mounted cabinet must be earthed via a protective
equipotential bonding conductor by a qualified
electrician according the valid standards and local
regulations. The flush-mounted cabinet must be
connected to the equipotential bonding rail of the
building via the central earthing point. The required
equipotential bonding cable made of copper has to
feature a minimum cross section of 6 mm² . Observe
the DIN VDE 0100-540 standard.
Installation
19

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

13445981344599

Table des Matières