1.ASSEMBLAGE MONTANT PIED ET MONTANT TELESCOPIQUE (p. 6)
1.ASSEMBLING TELESCOPIC POST & BASE POST (p. 6)
2.ASSEMBLAGE AU SOL MONTANT COMPLET (p. 7)
2.ASSEMBLING FULL POST TO THE FLOOR (p. 7)
4.MISE EN PLACE MONTANT (p. 9)
4.INSTALLING THE POST (p. 9)
6.MISE A NIVEAU VERTICAL ET HORIZONTAL (p. 11)
6.VERTICAL AND HORIZONTAL LEVELLING (p.11)
CHRONOLOGIE DE MONTAGE CONSEILLEE
ORDER OF ASSEMBLY RECOMMENDED
3.POSITION DES PERCAGES DE FIXATION (p. 8)
3.POSITION OF ATTACHING HOLES (p. 8)
5.MISE EN PLACE TRAVERSES BASSES (p.11)
5.INSTALLING THE BOTTOM RAILS (p. 11)
7.VERROUILLAGE ET MISE EN PRESSION MONTANT TELESCOPIQUE (p. 11)
7.LOCKING AND PRESSURISING TELESCOPIC POST (p.11)
2/16
8.VERROUILLAGE CONTRE-ECROU (p. 11)
8.LOCKING THE LOCKNUT (p.11)