2. Display
2.1.3. Production Log
Display Functions
Total production:
2
123456 kWh
Total operating time:
10 days, 20 hours
[-] Production log
[-] Time stamps
[-] De-rating
[-] Event log
Table 2.3: Production Log
8
Description
Total production since installation of inverter
Total operating time since installation of inverter
[-] This week
Production from this week
Monday: 37 kWh
Production from one day shown in KWh
Tuesday: 67 kWh
Production from one day shown in KWh
Wednesday: 47 kWh
Production from one day shown in KWh
Thursday: 21 kWh
Production from one day shown in KWh
Friday: 32 kWh
Production from one day shown in KWh
Saturday: 38 kWh
Production from one day shown in KWh
Sunday: 34 kWh
Production from one day shown in KWh
[-] Past 4 weeks
This week: 250 kWh
Production from this week shown in KWh
Last Week: 251 KWh
Production from one week shown in KWh
2 Weeks ago: 254 KWh Production from one week shown in KWh
3 Weeks ago: 458 KWh Production from one week shown in KWh
4 Weeks ago: 254 KWh Production from one week shown in KWh
[-] Past 12 months
January: 1000 kWh
Production from one month shown in kWh
February: 1252 KWh
Production from one month shown in kWh
March: 1254 KWh
Production from one month shown in kWh
April: 1654 KWh
Production from one month shown in kWh
May: 1584 KWh
Production from one month shown in kWh
June: 1587 KWh
Production from one month shown in kWh
July: 1687 KWh
Production from one month shown in kWh
August: 1685 KWh
Production from one month shown in kWh
September: 1587 KWh Production from one month shown in kWh
October: 1698 KWh
Production from one month shown in kWh
November: 1247 KWh
Production from one month shown in kWh
December: 1247 KWh
Production from one month shown in kWh
[-] Past years
Yearly production, up to 20 years back
This year: 10000 kWh
Production from this year shown in KWh
Installed: 31-12-07
Date of first grid connection
Power down: 21:00:00
When the inverter was last connected to grid
Prod. initiated: 06:00:00
When the inverter first connected to grid today
Total de-rate: 00000h
Period of time the inverter has limited power production in total, shown in hours
Latest event:
The latest event is displayed. The number is for service purposes
0
Zero indicates no error.
L00410310-03