Electrical connection
12
S Avoid stray fields from transformers, motors and con
tact switches
To ensure the best EMC protection, the load cell, to
gether with the connection cable and the subsequent
electronics, should be placed in a shielded housing.
Exception
Load cells with shielded, round cables are EMC‐tested in
accordance with EC directives and identified by CE certi
fication. But you must make sure that the shield of the
connection cable is connected to the shielding housing of
the electronics.
A2447-1.1 HBM: public
SP4M