11. Assembly
Caution!
Before commissioning the system flush, free drainage must be ensured by the
customer.
11.1 Interrupt the water supply.
11.2 Install the water volume regulators (b) with flush connector (d) leak-tight onto the
branch pipes (a) for hot water and cold water.
11.3 Align the water volume regulators so that the locking screw (c) and operating
element (e) are freely accessible.
11.4 Ensure free drainage (f) beyond the flush connector.
11.5 Open the water volume regulators using an Allen key.
g: closed
h: open
11.6 Re-establish the water supply.
11.7 Flush the pipes.
11.8 Check the water connections for leaks.
11.9 Close the water volume regulators (see
11.10 Unscrew the locking screws (c) on the water volume regulators.
11.11 Insert the filters (i).
☞
Important!
Note the installation position of the filters.
11.12 Screw in the locking screws (c).
11.13 Remove the flush connector (d).
11.14 Insert the solenoid valve (k) with the filter (l) and seals (m).
11.15 Connect the solenoid valve to the electronic module (see
purple: cold water
yellow: hot water
☞
For better heat transfer, it is recommended to place a couple of drops of thermally
conductive paste (to be provided by the customer) on the
sensor
(o).
contact temperature sensor
11.16 Place the
11.17 Place the flexible cable tie (n) around the
and tighten.
contact temperature sensor
11.18 Connect the
extension cable if necessary (see
blue: cold water
red: hot water
Work step
11.5).
(o) on the main lines (p).
contact temperature sensor
(o) to the electronic module. Use the
Chapter
10.).
- 6 -
Chapter
10.).
contact temperature
and the pipe