INSTALLATION
1
Cut the suspended ceiling based on the screen size (see chart on previous page).
2
Locate the screw holes on the case, then mark the position on the ceiling.
3
Drill holes in the ceiling on the marked positions. Insert dowels in the drilled holes (not provided).
Cut the threaded rod at desired height and screw them in the ceiling.
Screw hole
Threaded rods must be
perpendicular to the ceiling.
• Choose dowels according to your ceiling material (wood, concrete...) that can support the weight
of the screen.
• We highly recommend the use of a spirit level to make sure the threaded rods are vertical.
• If the ceiling is too high, you can add extensions for threaded rods.
Ceiling
16
UK
16mm
mini
Keep the threaded rods at
16mm from end caps.