Berner BACR 12 V Notice Originale page 14

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 18
OBJ_BUCH-2335-002.book Page 14 Friday, September 8, 2017 9:51 AM
Operation with Battery Pack
Note: Use of batteries not suitable for the construc-
tion site radio can lead to malfunctions of or cause
damage to the construction site radio.
Note: The battery pack is supplied partially
charged. To ensure full capacity of the battery
pack, completely charge the battery pack in the
battery charger before using for the first time.
 Use only the chargers listed in the technical
data. Only these chargers are matched to the
lithium-ion batteries permitted for use in your
construction site radio.
The lithium-ion battery can be charged at any time
without reducing its service life. Interrupting the
charging procedure does not damage the battery.
Insert a battery into the battery port 17 in such a
manner that the connections of the battery face
against the connections in the battery port 17, and
allow the battery to engage in the battery port.
The battery charge-control indicator b appears on
the display as soon as a battery pack with sufficient
voltage is inserted and the construction site radio
is not connected to the mains supply via the power-
supply plug 24.
The battery charge-control indicator b indicates the
current battery pack status. When the battery
charge-control indicator flashes, the battery pack
must be charged.
Indication
Capacity
2/3
1/3
<1/3
Reserve
Battery pack empty
To remove the battery pack 15, press the unlocking
buttons 16 and pull the battery pack out of the bat-
tery port 17.
Operation with Power-supply Plug
 Observe the mains voltage! The voltage of the
power source for the power-supply plug must
correspond with the data on the type plate of the
power-supply plug.
Open the protective cap of the 12 V connection
socket 23. Insert the plug-in connector 25 of the
12 V power-supply plug into the 12 V connection
socket 23. Connect the power-supply plug to the
mains supply.
 Use only the original Berner power-supply
plug intended for your construction site radio.
This measure will ensure proper operation of the
construction site radio.
After removing the plug-in connector, reattach the
protective cap of the 12 V connection socket 23 to
protect against dirt/debris.
14 | English
When not using the power-supply plug 24, it can be
stored in the storage compartment of the construc-
tion site radio. For this, disengage the locking latch
21 and open the lid 20 of the storage compartment.
Inserting/Replacing the Back-up
Battery
In order to store the time in the construction site
radio, back-up batteries have to be inserted. Using
alkali-manganese batteries is recommended for
this purpose.
To open the battery compartment, loosen screw 18
and remove battery lid 19. Insert the back-up bat-
teries. When inserting, pay attention to the correct
polarity according to the representation on the out-
side of the battery lid.
Mount the battery lid 19 again and tighten it with
screw 18.
Replace the back-up batteries when the time indi-
cation e becomes weaker and the construction site
radio no longer stores the time.
Always replace all batteries at the same time. Only
use batteries from one brand and with the identical
capacity.
 Remove the back-up batteries from the con-
struction site radio when not using it for longer
periods. When storing for longer periods, the
back-up batteries can corrode and discharge
themselves.
Operation
 Protect the construction site radio against
moisture and direct sunlight. The construction
site radio is suitable only for indoor use.
Audio Operation
Switching On and Off
To switch on the construction site radio, press the
On/Off button 3. The display 8 goes on and the last
set audio source after switching off the construc-
tion site radio is activated.
Note: When operating the first time via battery
pack or when not having used the construction site
radio for a longer period, it may be necessary to
press the On/Off button 3 several times or longer,
to switch the radio on.
Each time after pressing a button, the display 8 is
illuminated for several seconds.
To switch off the construction site radio, press the
On/Off button 3 again. The current audio source
setting is stored.
To save energy, only switch the construction site
radio on when using it.
1 609 92A 43Z • 8.9.17

Publicité

Table des Matières
loading

Table des Matières