Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

6 - INSTALLATION

Installation must be performed up to standard, in particular in compliance with this
manual, with DL25 of 7 February 2012 and, where pertinent, in compliance with the
provisions foreseen by DM 37 of 22 January 2008.
The device is designed for household installation and not outdoors, in a hygienically
suitable place, protected from freezing. It must also be connected to the electric
mains according to standards and to a drinking water mains according to standards,
while respecting the technical features provided in chapter 2.
The membranes are preserved in a bacteriostatic fluid. Therefore do
not use the initial water produced by a new system or when the osmotic
membrane has been replaced, but let it run for two 10 minute cycles,
with a 5 minute stop between one and the other.
A pre-filter must be used for well, cistern and surface waters.
Installations, repairs, interventions or changes must be carried out by
authorised personnel.
Before proceeding with installation, make sure there is sufficient space to:
Conveniently make the hydraulic connections
Easily extract spare parts
Perform maintenance.
Make sure there is a socket in the immediate vicinity of the appliance.
40
Hydraulic connection:
Perform the hydraulic connections according to
the writing on the unit: "IN" indicating the arrival of
drinking water; "OUT" indicating osmose water to
be sent to be drawn; "DRAIN" indicating the water
outlet sent to be drained.
Feed the unit with a John Guest tube with a minimum
outside diameter of 10mm. If the supply route is longer
than 3 m, use a tube with a larger cross-section.
Connect the dispensing circuit with a John Guest tube
with the proper cross-section.

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Oc 750

Table des Matières