Télécharger Imprimer la page

Performance Check - Jotul C 24 Manuel D'installation

Publicité

Les langues disponibles
  • FR

Les langues disponibles

english
Fig. 25
B
20. Pull the adapter (Fig. 25A) down firmly and tighten the nuts
(Fig. 25B) alternately to ensure the adapter is even. If needed,
use cement to seal between the flue pipe and adaptor. Put
the frame on (Fig. 12).
21. Refit all loose parts that were removed from the product.
16
A
B

4.12 Performance check

Once the product has been assembled, always check the control
handles. These should move easily and work in a satisfactory
manner.
Fig. 26
Lukket/Closed
C
Lukket/Closed
The Jøtul C 24 is equipped with the following operating options:
Air vent (Fig. 26A)
Left position
closed
Right position
fully open
Ignition vent (Fig. 26B)
Left position
closed
Right position
fully open
Åpen/open
A
B
Åpen/open

Publicité

loading

Ce manuel est également adapté pour:

C24