03
Run test and water-tightness test
Once you take steps described at point 02, please proceed with the test run. For this purpose clean the bathtub, fi ll it
with water (temperature 40 +/- 5˚C) until overfl ow level and then turn on whirl massage for 10 min. During this, please
monitor max. and min. speed. Then, turn off the whirl system for 15 min. After one hour, check water-tightness of pipes
and connectors. During next test run a disinfection must be done according to point 14.
After installation and leak test it is necessary not later than within 24 hours after fi lling of water and emptying the bathtub
to clean it and protect it from damage during the construction phase. If the above condition is not followed, the warranty
is not valid.
04
Diagram
7
1 The steering connection to the mains 230V~,
50/60 Hz, 10 A connection box self- provided
2 Sewerage system terminal Ø 40/50
3 Controller
4 Blower Unit
5 Control panel
6 Back jet (optional equipment)
7 Feet jet (optional equipment)
8 RGB - LED
2
8
4
3
5
6
8
1
15
GB