Safety Information; Water Temperature - Bradley S19-310PVC Installation

Combiné douche oculaire / faciale
Masquer les pouces Voir aussi pour S19-310PVC:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

S19-310PVC

Safety Information

To ensure proper operation:
Installation
This fixture has been designed and 3rd party tested to meet ANSI/ISEA Z358 .1 . The system must be tested
periodically to be sure it is functioning properly to meet the standard . Please refer to the ANSI/ISEA Z358 .1 standard
on testing requirements .
The installation, maintenance and location of all safety drench showers, eye and eye/face washes must comply with
the requirements of ANSI/ISEA Z358 .1 . Workers who may come in contact with potentially hazardous materials
should be trained regarding the location and proper operation of emergency equipment per ANSI/ISEA Z358 .1 .
ANSI/ISEA Z358 .1 requires this unit to be used with a clean, potable, uninterrupted supply of tepid water . Bradley
plumbed emergency fixtures require a minimum of 30 psi flowing pressure in order to function as designed and meet
the ANSI/ISEA Z358 .1 standard .
Before installation make sure that this equipment will meet the requirements of the potential hazardous contaminants
in your location .
Installation of this system must be completed by a qualified plumber in compliance with all national and local codes .
Compliance and conformity to drain requirements and other local codes and ordinances is the responsibility of the
installer .
Weekly Inspections
To ensure all emergency shower and eye/face wash fixtures are ready to be used when needed, regular checks and
maintenance must be conducted . Weekly inspections must be conducted on all safety equipment to make sure a
suitable flushing fluid supply is present and to make sure the equipment is in good operating condition .

Water Temperature

ANSI/ISEA Z358 .1 requires tepid water . Suitable range is 60°F to 100°F (16°C to 38°C) . Personal injury is possible
outside this temperature range .
2
2/15/2021
Bradley • 215-1134 Rev. X: ECO 19-05-034A
Installation

Publicité

Table des Matières
loading

Table des Matières