3.
Using claw portion of hammer, set each anchor (D) by
pulling it out of hole approximately 1/4". (See Figure 6)
4.
Insert portion of manufactured loop on cable (C) through
hole in anchor (D) (See Figure 6). Insert end of cable (C)
through loop. Repeat for remaining support locations.
Steel Truss Ceiling Structure
1.
Route end of cable (C) over truss at marked cable anchor
support location and then through cable loop. (See Figure 7)
Repeat for remaining support locations.
1
(C)
Figure 7
Wood Ceiling Structure
WARNING:
Anchors must be installed into wood with a
minimum thickness of 1-1/2" (38.1 mm) or greater.
1.
Drill 5/32" (4.0mm) diameter x 2" (51mm) deep hole at each
marked cable anchor support location. (See Figure 8)
Remove debris from hole.
1
5/32"
(4.0mm)
Figure 8
2.
Fully thread eye lag (E) into each hole. (See Figure 8)
3.
Route end of cable (C) through eye lag (E) and then through
cable loop. (See Figure 8) Repeat for remaining support
locations.

TRAY INSTALLATION

1.
If you are replacing an existing tile, proceed to Step 3.
Otherwise, continue below.
2.
Reinstall ceiling tile with extension column hole. Ensure tile
is oriented for proper location of hole.
3.
Reinstall ELPMBP06 assembly (A).
8
3
(C)
2
(E)
4.
Install four clamp brackets (B) with four Phillips head
10-24 x 5/8" screws (G). (See Figure 4) Ensure brackets (B)
engage flanges on ELPMBP06 assembly (A) and primary
(1-1/2" (38mm) high) rails of ceiling framework.
(B)
4
(G) x4
Figure 9
CAUTION:
Failure to properly tension cables (C) may
result in damage to ceiling tile framework!
5.
Thread each cable (C) completely through cable lock (F),
corresponding hole(s) in corner of ELPMBP06 assembly
(A), and completely through opposite side of cable lock (F)
(See Figure 10). Adjust cable tension until ELPMBP06
assembly (A) is supported entirely and evenly by all four
support cables, but not so tight as to distort ceiling tile
framework.
NOTE:
Cables (C) can be threaded through either or both
holes in corners of ELPMBP06 assembly (A).
NOTE:
Cable lock (F) will allow cable to enter from only one
direction per side, indicated by arrows on lock.
Depress spring loaded pins on cable lock (F) to release
cable tension.
C
F
5
Figure 10
Installation Instructions
1.5" (38mm)
(A)
A
(C, F) x 4