Argo AUAH Notice D'installation page 8

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

3.2 - HOW TO INSTALL THE UNIT
EG
IINSTALLATION TO THE WALL OR ON THE FLOOR
• Remove the front panel from the unit, pulling towards you (fig. 1) .
NOTE:
The panel is connected with two wires to the electrical junction
box. Be careful not to pull the wires and, in case, disconnect them.
• Make 4 holes in the wall, using the supplied template (see fig. 2) .
Use pins and screws (not supplied) that are appropriate to the
weight of the unit and the type of wall .
• Hook and fix the unit.
• Replace the front panel, reconnecting the wires that you have
eventually disconnected .
REAR VIEW
INSTALLATION ON EMIX TANK V2
• Place the unit on Emix Tank V2, aligning the front and side panels.
• Maximum height with 200l: 1948mm.
• Maximum height with 300l: 2363mm.
4 x ø 8
Fig. 2
FRONT VIEW
ø 8
ø 14
ø 8
8
Fig. 1
495
ø 8
ø 14
ø 8

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

AubhAuchAudh

Table des Matières