Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

2.3 - ADDITIONAL MATERIAL REQUIRED FOR INSTALLATION (NOT SUPPLIED)
• Deoxidized annealed copper tube for refrigerant tubing connecting Emix; it has to be insulated with foamed
polyethylene (min . thickness 8mm) .
• Anti-freeze oil for flare connections (about 30g .)
• Electric wire: use insulated copper wires of size and length as shown at paragraph "SYSTEM WIRING DIAGRAMS" .
• Tubes for water .
Tools required for installation (not supplied)
1 . Standard screwdriver
2 . Phillips head screwdriver
3. K nife or wire stripper
4 . Tape measure
5 . Level
6 . Sabre saw or key hole saw
7 . Hacksaw
8 . Core bits ø 5
3 - INSTALLAZIONE
3.1 - INSTALLATION LOCATION
The unit must be installed in a closed location .
AVOID
• Proximity to heat sources, exhaust fans .
• Proximity to combustible materials.
• Direct sunlight .
• Locations where the unit could be splashed with
water or affected by dampness or humidity (i .e . in
laundries) .
• Unsteady locations that will cause noise or possible
waterleakage .
• To make holes in areas where electrical wiring or
conduits are located .
IMPORTANT NOTES
• Select a sufficiently strong location/wall to support
the weight of the unit .
• Leave a minimum operation and maintenance area
around the unit .(See figure) .
19 . Hammer
10 . Drill
11 . Tube cutter
12 . Tube flaring tool
13 . Torque wrench
14 . Adjustable wrench
15 . Reamer (for
reburring)
16. H ex. key
7 7
EG
20 cm

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

AubhAuchAudh

Table des Matières