Dometic GROUP WAECO ColdMachine 54 Notice D'utilisation page 41

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 54
ColdMachine
Installing the vaporiser
The vaporiser must be installed in the cooling container (except CS-NC15,
the vaporiser is premounted).
➤ Observe the following in the process:
 Correct installation position (fig. 3, page 4 up to fig. 0, page 6)
 Arrangement in the cooling container as far to the top as possible
 Install a least 10 mm from the wall (not VD-14N and VD-15).
NOTICE!
A
For cooling units without valve couplings (ready-to install units):
Do not open the refrigerant circuit during installation. You may have
to make the wall openings larger to be able to slide the vaporiser
through them (fig. b, page 7). Or alternatively, you create an open-
ing that allows you to install the cooling lines at the top (fig. c,
page 7).
Connecting the vaporiser
➤ Connect the vaporisers VD-14N and VD-15 in accordance with fig. a,
page 7.
➤ Connect vaporiser VD-16 according to fig. 9, page 6.
➤ Connect vaporiser VD-17 according to fig. 0, page 6.
➤ Connect vaporiser VD-06 according to fig. k, page 10.
➤ Connect other vaporisers according to fig. j, page 9.
Keys for the illustrations
No. in fig. 8,
page 5
1
2
3
4
5
No. in fig. 9,
page 6
1
EN
Explanation
DC fan
Thermostat button
Connection plug for DC fan
Thermostat
Connection cable
Explanation
Connection cable
Installing the cooling unit
41

Publicité

Table des Matières
loading

Table des Matières