Devon&Devon Savoy V Instructions De Montage page 23

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 44
7)
Centre the shower enclosure (keeping it closed) by sliding the
frame of the enclosure on the fixed profiles and fasten everything
using the self-tapping screws (supplied) from the inside.
3
4
1
2
It is important that you fasten the holes
on the bottom part (1 and 2) first,
followed by the ones on the top part
(3 and 4).
22

Publicité

Table des Matières
loading

Produits Connexes pour Devon&Devon Savoy V

Table des Matières