Handlebar Installation - Yamaha WaveRunner XLT800 2001 Manuel De Montage

Table des Matières

Publicité

HANDLEBAR INSTALLATION

EXPLODED DIAGRAM
INSTALLATION CHART
Step
Procedure/Part name
HANDLEBAR INSTALLATION
1
Upper handlebar holder
Bolt 8 × 48 mm (0.31 × 1.89 in)
2
Screw 6 × 14 mm (0.24 × 0.55 in)
3
Q'ty
Follow "Step" order for installation.
NOTE:
2
Align the punched mark a on the handle-
G
bar with the top surface of the lower han-
dlebar holder.
G
The upper handlebar holder should be
installed with the punched mark b forward.
NOTE:
4
Tighten the bolts so that the front clearance
c of the upper handlebar holder is smaller
than the rear clearance d .
Reference clearance:
4
– 7 –
Service points
c: 1.5 mm (0.06 in)
d : 3.5 mm (0.14 in)
E

Publicité

Table des Matières
loading

Table des Matières