Preparation For Automation Of The Base - Allmatic BEVK4 Manuel D'emploi

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

PREPARATION FOR AUTOMATION OF THE BASE

1. Provide a foundation pit and arrange one or more conduits for the passage of the electrical cabling.
2. Assemble the 4 anchoring brackets on the mounting plate and fasten with the 4 bolts provided.
3. Pour the concrete into the pit and position the base plate.
NOTE: verify that the plate is perfectly leveled and parallel to the opening barrier.
4. Wait for the complete setting of the concrete.
5. Unscrew the 4 nuts that hold the base joined to the anchoring brackets and position the rack on
the plate.
11

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Bevk6

Table des Matières