Ezviz DB1 Guide Rapide page 10

Masquer les pouces Voir aussi pour DB1:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 34
1
Shut off the electricity at the breaker that controls
doorbell's circuit.
3
Insert the mini-level into the mounting plate and mark
the drill points when its bubble stays in the middle.
Mini-Level
Remove the mini-level when drill points are marked.
Doorbell Installation
2
Optional) When the wall is uneven, paste the plate
foam to the mounting plate.
4
Drill holes according to drill points and insert anchors.
5
Anchor

Publicité

Chapitres

Table des Matières
loading

Table des Matières