8
NOTE! Floor voids and openings influence negative
statics and fire regulations. (Diagram 8)
> Coordinate and implement measures for floor
voids and openings with the site manager.
9
Height construction (Diagram 9)
> Produce a screed base or install a DuravitRapid
base element (from Stadur).
26
27
-
Screed work (Diagram 26)
> Installation steps should be carried out by a
trained screed layer.
28
30
-
Sealing and tile work (Diagram 28)
> Installation steps should be carried out by a
trained tiler.
• Sealing material is not included in the scope
of delivery.
31
46
-
Plumbing (Diagram 31)
> Installation steps should be carried out by a
trained plumbing engineer.
40
Apply ≥ 900 mm of foam under the shower tray
(Diagram 40)
> Observe the information on the 2K polyurethane
foam.