Télécharger Imprimer la page

Transport, Packaging And Storage; Commissioning, Operation - WIKA A2G-85 Mode D'emploi

Publicité

Les langues disponibles
  • FR

Les langues disponibles

5. Transport, packaging ... / 6. Commissioning, operation

5. Transport, packaging and storage

5.1 Transport
Check the CO
sensor for any damage that may have been caused
2
during transportation. Obvious damage must be reported immediately.
5.2 Packaging
Do not remove packaging until just before mounting.
Keep the packaging as it will provide optimum protection during trans-
port (e.g. change in installation site, sending for repair).
5.3 Storage
Permissible conditions at the place of storage:
Storage temperature: -30 ... +80 °C
Protect the CO
2

6. Commissioning, operation

Installation and mechanical connection
The instruments are supplied in an operational status. The instrument
is already equipped with a 1.5 m long connection cable and there is no
need to open it. If an opening of the cover becomes necessary, make
sure that the case is hermetically sealed again afterwards.
Mounting flange
WIKA operating instructions air2guide model A2G-85
sensor from humidity and dust.
The mounting to the ventilation duct is
made by means of the flange included
(mounting screws are not included in the
delivery).
Air velocity max. 10 m/s
GB
9

Publicité

loading