REPORTS
Reports are very important because they are documented proof that the cables tested are fit
•
for purpose, and are a record of the length of cable installed. To select the required report
style press F3(SETUP) in the HOME screen, then select REPORTS.
To include your own logo in the PDF reports, from the HOME screen
select F3 (SETUP) / SYSTEM / OWNER / F1 (LOGO). Insert a USB
memory key containing an image named logo.png with maximum size of
250 x 160 pixels.
156840.04
To include your details in the reports, from
the HOME screen select F3 (SETUP) /
SYSTEM / OWNER.
To include the Job details in the reports,
from the HOME screen select F1 (JOBS) /
F1 (EDIT) or F2 (OPTIONS) / NEW.
There are 2 reports available:
The Summary report lists a summary of all
tests in a job.
The Full report lists a summary and details
for every test in a job.
Test0001 is a 4-Pair 568B UTP cable, 2
metres long. It has failed the Wiremap
because pin 7 is missing and failed Data
tests because it can not support 1Gbit/s.
However it can support 10Mb/s and
100Mb/s.
Test0002 is a 4-Pair cable, 2 metres
long. It has passed both the Wiremap
and Data tests and can support
10Mb/s, 100Mb/s and 1Gbit/s
Test0003 is a 4-Pair 568A UTP cable, 2
metres long with pins 1 and 2 reversed.
It has failed the Wiremap test but
passed the Data test. Because the
wiremap failure is not critical it can
support 10Mb/s, 100Mb/s and 1Gb/s.
Test0004 is a 4-Pair 568A UTP cable, 2
metres long. It has passed the
Wiremap test but failed the Data test
because Ethernet errors were
detected. It will not support 1Gb/s. It
may support 10Mb/s or 100Mb/s but
this can not be guaranteed.
Test0005 is a 2-Pair 568A UTP cable, 2
metres long. It has passed the
Wiremap and Data test. It will support
10Mb/s and 100Mb/s.
SignalTEK CT
En
10