9.4
Cut off the protruding ends of the cable core so that they are flush, i. e. so that they
do not protrude.
9.5
Place the union nut (d) on the electric T-junction (g) and tighten with the required
torque (1.2 Nm).
Caution!
Ensure correct polarity.
Each core cable colour must be in the same cable core guide on both union nuts.
☞
When the union nut is being tightened, an electric contact and the pull-relief are
automatically established.
Special seals provide protection against dust and water.
9.6
Install the electronic module in the vicinity of the solenoid valve.
9.7
Install the line connections between the electronic module, the solenoid valve and
the sensor.
A: Solenoid valve
B: Sensor (sensor input 2/3)
C:Not used
D:Electric T-junction system lines (Power)
E: Electronic module
9.8
Close the water volume regulator with a hollow hexagon wrench.
h: closed
i: open
9.9
Unscrew the screw plug (k) on the water volume regulator.
9.10 Insert the grit filter (l).
☞
Important!
Ensure that the grit filter is positioned the right way round.
9.11 Open the flow volume regulator.
10. Function
☞
The temperature of the liquid delivered into the urinal must be higher than the
ambient temperature.
10.1 Using the Urinal.
• After approx. 25 seconds the urinal is flushed for 8 seconds.
• After a further second the urinal is flushed again for 0.5 seconds. This ensures
that the odour trap is filled properly.
☞
Forced flushing has been factory set to take place after 24 h of disuse.
10.2 Flow duration and forced flushing can be set via the system software.
7