Preparation; Installation; Operating - Goobay 55488 Mode D'emploi

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 17
4

Preparation

>> Compare the specifications of all used devices to ensure com
patibility.
>> Check the scope of delivery for completeness and integrity.
5

Installation

The surface must be stable. The supplied mounting material is only for
concrete and stone walls. For mounting on other surfaces, other dowels must
be used.
Plants, street lighting, reflecting surfaces and arbitrarily moving objects may
not be located in the detection area. Recommended mounting location: as
sunny as possible, 3-4 m mounting height.
1. Use the allen key (9) to lossen the screw fixing (6) of the bracket.
2.
Carefully unfolding the bracket and the LED light (1) as shown in Fig. 5.
Fig. 5: Unfolding the LED solar wall
3. Adjust the desired angle of inclination and tighten the screw fixing
again.
4.
Draw 2 mounting holes on the wall at the distance of the mounting
lugs (4).
5.
If necessary, use a spirit level for marking.
6.
Drill 2 mounting holes with a Ø 8 mm drill.
7. Insert the fixing screws with the metal dowels (8) into the drilling
hole.
Leave the screw heads about 4 mm out of the wall.
8.
Hang the product on the mounting lugs (4) of the bracket onto the
fixing screws.
9.
Hold the LED solar wall light with the other hand.
10. Gently tighten the fixing screws.
6

Operating

The range can not be
It can be varied due to the mounting height and angle of inclination.
The switch-off delay cannot be set.
The trigger sensitivity cannot be adjusted.
1.
Switch on the LED solar wall light via the control panel (7). See Fig.
6 and table 4.
2.
Select the desired mode:
adjusted.
12

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

55489

Table des Matières