Café Joy V2
Preheating the appliance
Fill the water tank with water as de-
scribed in the section Filling with
water (page 32).
Put the strainer insert into the holder
as described in the section Installing
the strainer insert (S. 35).
Insert the trainer holder (12) without
coffee powder into the appliance as
described in the section Installing the
strainer holder (page 35).
Place a cup onto the drip tray (14) un-
der the strainer holder (12).
Press
/ (31). The green indicator
light "Espresso machine" (29) and
the yellow indicator light "Heater" (30)
light up and the appliance begins to
heat up.
After approx. 3 minutes, the yellow in-
dicator light "Heater" (30) extinguishes
Turn the function selection switch (5)
to the
position and allow the hot
water to run into the cup.
Turn the function selection switch (5)
to the
middle position when the cup
is full.
36
Making espresso
Preheat the appliance as described in
the section Preheating the appliance
(page 36).
Check the water level in the water
tank (1) and add water, if necessary.
Remove the strainer holder as de-
scribed in the section Removing the
strainer holder (page 35).
Fill the strainer insert (13) with coffee
powder to the top and wipe off any ex-
cess coffee powder with the handle of
the measuring spoon (image C1, C2).
NOTE
►
Do not overfill the strainer insert. An
overfilled strainer insert cannot be
inserted into the appliance.
Press down the coffee powder lightly
using the tamper (10) (image C3).
NOTE
►
Remove any surplus coffee powder
from the edge of the strainer holder
in order not to stain the seal of the
brewing unit (6).
Insert the strainer holder (12) into the
appliance as described in the sec-
tion Installing the strainer holder
(page 35).
Place a cup onto the drip tray (14) un-
der the strainer holder (12).
BEEM - Elements of Lifestyle
EN