Bergstrom Integral power II Instructions De Montage page 21

Masquer les pouces Voir aussi pour Integral power II:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

INTEGRAL POWER II
CABIN EXTERIOR:
4
Position the Integral Power II unit in the hatch
gap.
4
CABIN INTERIOR:
5
Thread about 5 mm (4) studs 8 / 125x100-70
or 120 on the threads of the reinforcements
indicated (*), the measurement will be chosen
after aligning up the clamping brackets and
taking into account that the studs should
protrude through the bottom by about 20 mm.
Position (1) Ø7 rubber washer, (1) Ø8 flat wide-
6
rimmed washer, (2) M8 nut and (1) Ø8 flat wide-
rimmed washer on each of these studs, in the
same order.
5
Base
*
Ø8 Flat
wide-rimmed
Rubber
washer
washer
6
21
5 mm
Stud
Support piece
20 mm
*
Ø8 Flat
wide-rimmed
washer
M8 nut
EN
4

Publicité

Table des Matières
loading

Table des Matières