General Instructions
10. Place no.6 over no.2. Attach
no.12 (flange cap) onto no.8 and
tighten.
6
Note: Hook and bolt installation
will be similar on other units.
36
40
11. Insert no.39 through bottom hole
of no.6, screw on no.38 at top of
no.6, place no.37 onto no.38. No.36
goes onto no.37, then screw no.35
onto no.39 and tighten. Position
no.37 as desired. Tighten no.40 as
needed.
Installation: Kettle Kaddy
Assembly
Note: Use item numbers from
B-0180 exploded view.
Other models are similar.
12. Remove no.3 (yoke) from no.1
valves by unscrewing coupling nut
from no.3 (yoke).
6
coupling
nut
13. Remove spindle assembly from
no.1, screw no.1 valve body onto
8
no.8.
12
flange
14. Apply teflon tape or pipe joint
cap
compound to threads of no.8. Place
no.1 onto no.8 as far as it will go.
35
37
38
39
15. Replace spindle assembly into
no.1 body.
16. Replace no.3 onto no.1 coupling
(with no.4 in place) and tighten with
a wrench.
17. Attach no.7 to no.6.
18. Attach no.31 to no.5.
19. Turn on
5
water and check
3
for leaks.
4
1
spindle
1
assembly
1
8
12
flange
cap
31
7
6
5
3
1