TC 12. Commissioning and Inspection
TC 12.1 COMMISSIONING
To be done
Component/parameters
Check for residual
§
§
Pipes
§
§
Valves
§
§
Probes
§
§
Nozzles
Check spray water quality
Current chemical and microbiological analysis of the spray water in accordance
with the specification
Unit for makeup of spray water
Unit installed and ready for operation
and online control
Check WFS
§
§
The wet fin system is installed properly
§
§
The wet fin system is operating properly
Documentation
Documentation complete and handed over to the operator
Instruction
The operator is instructed
TC 12.2 INSPECTION
Action to be done and documented regularly, besides those listed in materials for the heat exchanger:
Position
Component/parameters
Frequency
1
Unit for makeup of spray water
Yearly
and online control
2
Spray water
Quarterly
3
Probes
Yearly
4
UV Lamp
Yearly
5
Spray nozzles
Monthly
6
Complete unit
Monthly
21
MT TC R WFS EN 03 2018
Action to be done by indication
Inspection of functioning and damages
Chemical and microbiological analysis
Inspection of functioning, residues and damages
Inspection of functioning, residues and damages
Check spray
Check for damage, leakage and residues
Technical Manual TC Instruction and technical data
MT TC R WFS EN 03 2018
22

Publicité

Table des Matières
loading

Produits Connexes pour ThermoKey Wet Fin Systems

Ce manuel est également adapté pour:

Wfs

Table des Matières