Produktgruppen 512, 522, 592
27 von 28
Danger!
Even with the machine switched off, supply voltage may be applied to some components.
Before starting any service work, the machine must be disconnected from the power supply. Suitable measurements must be made to
ensure that this is the case.
A general visual check should always be carried out.
Incorrect conversion or service work could lead to a risk of fire or gas explosion.
Danger!
Risk of injury during installation:
Danger of electric shock. Before starting any service work, all voltage-carrying components must be disconnected from the power
supply.
Only install this stand on machines that are uninstalled. For uninstallation instructions, see the machine's operating manual.
Wear non-skid gloves and shoes.
Make sure that no body parts, especially hands and feet, can get stuck under or between machines.
Make sure that no children or pets are in the work area during installation.
Risk of spinal injury. Keep in mind the weight of the machine in respect to your own body weight. For machine weights, see the
operating manual.
Danger of tipping due to incorrect installation.
Always bolt the machine(s) and stand(s) together.
When installing only one stand, secure it to the floor using foundation kit no. 01497252.
When securing, all four of the stand's feet must be on the floor.
Do not use the stand for a washer/dryer combination.
Note
This stand should only be used for the following Miele machines:
PW 6080, PW 5082, PT 7186, PT 5186
Note
Required tools:
Level, for vertically and horizontally aligning the stand
10mm wrench, for M6 nuts
Torx T20 screwdriver
Note
Installation kit mat. nos. 07689330 and 07129240 contain:
1 UO 6008 stand (for kit no. 07689330)
1 UG 6008 stand, 1 front panel, 2 side panels, 12 M4 x 12.4 screws (for kit no. 07129240)
1 foundation kit with packet: 4 brackets / 8 zinc-plated B6.4 washers / 4 M6 x 30 hex screws / 8 M6 hex nuts / 4 S12 studs /
4 8.4 washers / 4 8 x 65 hex wood screws / 20 shims / 8 38mm washers
1 packet containing these instructions and startup card.
List of illustrations:
Fig. 1, Stand height
Fig. 2, Drilling dimensions
Fig. 3, Hole dimensions
Fig. 4, Installing the foundation kit
Fig. 5, UO 6008 stand
Fig. 6, Installing the brackets
Fig. 7, UG 6008 stand
Abbreviation
UM
A-A
22.02.2012
Diese Unterlagen dürfen ohne unsere Genehmigung weder vervielfältigt noch Dritten zugänglich gemacht werden. Eigentumsrechte vorbehalten.
Explanation
Stand
Sectional plane
Umbau- und Montageanweisung
M.-Nr. 07707491