Perel GZB8 Notice D'emploi page 4

Tente d'événement 440 x 440 x 233cm
Masquer les pouces Voir aussi pour GZB8:
Table des Matières

Publicité

1. In
ntroduction
Thank y
you for choosing
dealer.
2. Sa
afety Instru
Follow these
Set up and b
Make sure th
down the sh
The cover m
near the she
Fam
miliarise yourself
All m
modifications of t
the
device is not cov
Dam
mage caused by d
dea
aler will not accep
Kee
ep this manual fo
3. Ge
eneral guid
Prot
tect the shelter f
Onl
y use the shelter
war
rranty.
NEV
VER store the she
and
d mildew, which w
4. Fe
eatures
cov
er in 160gr/m² h
PU
coating and anti
Colo
our: warm grey
incl
uding 8 guy rope
in s
strong polyester c
opt
ional accessories
5. Se
etting up
Refer to
o the illustrations
Locate
corners
It is im
mportant that the
the co
orner locator to m
• Plac
ce the metal hoo
• Exte
end metal hooks
will
be 19.8' (±604c
• Unh
hook the metal h
• Plac
ce a pad foot [4]
Set up
the shelter
• Ass
emble the peak p
pole
es.
• Part
tially assemble th
avo
oid problems whe
• Inse
ert the peak pole
on t
top of the ridge h
• Unf
fold the canopy a
• Full
y assemble the f
• Loc
ate the hook and
• Inse
ert the ends of th
• Driv
ve pegs through
• Wra
ap the web straps
tigh
hten.
• At e
each corner, atta
the
canopy.
• Whe
en necessary, att
20.12.20
011
User m
n
Perel! If the pack
kage was damag
uctions
e instructions car
refully.
break down requ
ires two adult pe
he weather cond
itions are suitabl
helter.
material of this sh
helter is flammab
elter.
with the function
ns of the device b
the device are fo
orbidden for safet
vered by the war
rranty.
disregard of cert
ain guidelines in
pt responsibility f
for any ensuing d
or future referenc
ce.
delines
from shocks and
abuse. Avoid bru
r for its intended
purpose. Using t
elter unless it is c
completely dry. S
will rot natural fib
bers, damage the
high density poly
ester
UV-coating 30+
es and 16 pegs
carrying bag
s: side wall GZB8
8/SP1, side wall w
on pages 2 and
3 of this manua
e four pad feet [
4] form a square
mark the location
ns (see figure pag
k of the corner lo
ocator at position
B and C out; ma
ake sure they for
cm).
ook from corner
A and move it d
] at every corner
r, angle facing inw
poles [3] and att
tach them to the
he four leg poles
with ridge hub [
en installing the c
canopy – see ima
es [3] into the rid
dge hubs [2] of
hub.
and pull over the
frame (loop and
four leg poles [2
].
d loop fasteners a
and wrap them a
he four leg poles
[2] into the pad
the holes in the
pad feet [4] to s
s around the pole
es at the four cor
ch the hook end
of the canopy to
tach the guy line
es [b] to the web
GZB
8
anual
ed in transit, do
not install or use
ersons.
e (e.g. not too w
windy) for setting
le. DO not make
e open fires (e.g.
before actually us
sing it.
ty reasons. Dama
age caused by us
this manual is n
ot covered by th
defects or proble
ms.
ute force when de
eploying, folding
the shelter in an
unauthorised wa
Storing when dam
mped allows the
e coating to the f
fabric and leave i
with 2 windows a
nd 1 door GZB8/
l.
e with sides of 14
4' (±427cm). Use
ge 2).
n A. Mark the loc
cation with a stak
rm a 90° angle. T
The distance betw
iagonally to find
corner D.
ward (toward the
e other pad feet)
e centre hub [1]
following the arr
[2] (do not inser
rt the lowest part
age).
the legs. Make s
ure the metal pin
hook fasteners f
facing down).
around the poles.
d feet [4].
secure them.
rners and close t
the snap-in buckl
o a hole in the foo
ot and pull down
b loops [a] and c
connect them to s
4
e it and contact y
your
up or breaking
barbeque) unde
er or
ser modifications
to
e warranty and t
the
up or during usa
age.
ay will void the
formation of mol
ld
indelible stains.
/SP2
e the metal hook
ks on
ke.
ween points B an
nd C
.
row markings on
the
ts of the poles ye
et to
ns lock into the s
slots
es. Pull the strap
ps to
the strap to stre
etch
stakes [c].
©Velleman n
nv

Publicité

Table des Matières
loading

Table des Matières