08
Vessel
09
Ball valve at condensate drainage point
10
Pressure switch with ON/OFF switch
11
Safety valve
12
Pressure gauge (vessel pressure)
13
TÜV test flange
14
Electric motor
15
Cradle
16
V-belt
17
Belt guard grating
18
V-belt disc
19
Fan wheel
20
Solenoid valve
21
Silencer
22
Ball valve
23
Rubber dampers
1.6
Commissioning
Observe the safety instructions!
1.6.1 Attach rubber dampers
Crane: guide a suitable loading strap or
chain through the console. Do not damage
any compressor components.
Fork-lift truck: guide only one prong of the
fork into the console on the compressor. Do
not damage any components, especially the
ball valves.
See instruction manual, part 2.
1.7
Maintenance
1.7.1 Cleaning the intake filter
1. Open two latches, remove cover from fil-
ter housing. (Fig. 2a)
2. Remove filter insert.
3. Blow out from the inside.
4. Slide filter insert into position, replace
cover, close latches.
1.7.2 Clean the silencer insert
1. Unscrew silencer cover.
2. Pull out silencer insert and clean in soapy
water (max. 50°C).
3. Slide insert into position, screw on si-
lencer cover.
If the insert can no longer be cleaned
properly, replace the complete silencer
unit.
1.7.3 Checking, setting and ad-
justing the V-belt tension
Preparation/Checking V-belt tension:
See instruction manual, part 2.
Changing V-belt:
1. Slacken counternut and remove.
2. Slacken second nut and slide drive motor
towards power unit. (Fig. 7b)
3. Remove old V-belt and replace with new
V-belt.
4. Tighten nut until V-belt tension is cor-
rect.
5. Lock counternut.
6. Attach the belt guard grating again using
the mounting plugs.
Adjusting V-belt tension:
See Chapter "Changing the V-belt", work
steps 1, 4, 5, 6.
1.8

Compressor inspections

An informal inspection book (collection of all
documents related to the vessel including in-
spection documents from the "approved test
centre") must be compiled for the com-
pressed air vessel on this compressor. The
vessel must be registered at an "approved
test centre" and this documentation made
available. The centre initiates and certifies
installation checks performed by authorised
experts and specifies the intervals for repeat
inspections. We recommend an inspection
interval of 5 years.
The papers accompanying the vessel are
approval documents and must be kept
throughout the service life of the vessel.
These specifications only apply in Germa-
ny. Equivalent regulations apply in other
countries.
UNM-STH 960-10-500
GB
I/5

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

T800146

Table des Matières