Installation; Rigging; Dmx Connection - Evolite EvoScan 90 Mode D'emploi

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

 Installation
o Rigging
The installation of the projector has to be built and constructed in a way that it can hold 10 times the weight for 1 hour without any
harming deformation.
IMPORTANT!OVERHEAD RIGGING REQUIRES EXTENSIVE EXPERIENCE, including calculating working load limits, installation material
being used, and periodic safety inspection of all installation material and the projector. If you lack these qualifications, do not attempt
the installation yourself, but instead use a professional structural rigger. Improper installation can result in bodily injury and or damage
to property. The projector had to be installed out of the reach of people
Always secure your fixture with a safety cable !
o DMX 512 connection
The wires must not come into contact with each other, otherwise the fixture will not work at all or properly. Please note the starting
address depends upon which controller is being used. Only use a DMX cable and 3-pin XLR-plugs and connectors in order to connect
the controller with the fixture or one fixture to another
Connection with the mains.
The earth has to be connected. The device must only be connected with an electric installation carried out in compliance with IEC
standards.
EvoScan 90 Manual Ver. 1
Page 14

Publicité

Table des Matières
loading

Table des Matières