CONTROL PANEL
DISPLAY
Ready Signals
• The machine is ready for whole bean coff ee
brewing and hot water dispensing.
Green
• The machine is ready for pre-ground coff ee
brewing.
Green
• The machine is in the steam dispensing
phase.
Green
• The machine is in the hot water dispensing
phase.
Green
•
The machine is brewing 1 espresso coff ee.
Green
•
The machine is brewing 1 long coff ee.
Green
•
The machine is brewing 2 espresso coff ees.
Green
•
The machine is brewing 2 long coff ees.
Green
• The machine is programming the amount of
coff ee to be brewed.
Green
• 44 •
• 44 •
Warning Signals
• The machine is warming up to brew coff ee
and dispense hot water or steam.
Orange
• The machine is performing the rinse cycle.
Wait until the machine automatically stops
brewing the beverage.
Orange
• The machine must be descaled.
Orange
• The brew group is being reset due to machi-
ne reset.
Orange
• The coff ee bean hopper needs to be refi lled
with coff ee beans to restart the brewing
cycle.
Orange
•
The Intenza fi lter must be replaced with a
new one.
This message will only be dis-
played if the function is activated
Orange
in the programming mode.
The alarm is deactivated only if it is "RE-
SET" in the programming mode.
Orange