Installing The Extraction Hood - Backer 657391 Manuel D'instructions

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

Installation

Installing the extraction hood

Make sure that when drilling the holes no lines are damaged.
Caution!
Please observe your cooker's instruction manual! If a greater
Important!
clearance than 65 cm is specified, this must be taken into
consideration.
1. In order to position the appliance exactly above the cooker in the centre,
make a guide line on the wall (vertical line, with the aid of a spirit level or
plumb line, from the centre of the cooker to the ceiling).
2. Position the extraction hood 1 on the wall in such a way that the clearance
to the cooker (min. 65 cm) is maintained and the centre of the extraction
hood is flush with the vertical line.
Use a spirit level to check the alignment.
3. Please attach throttle valve on vent hole of exhaust hood before installing
extraction hood.
4. Hold extraction hood up to horizontal aid line and mark the two top drill
holes.
If possible, move the cooker so that there is sufficient space to install
Important!
the extraction hood. Use a stable ladder and get a second person to
assist you.
Preparation
Plumb line
11
English

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

1022633Ah60a-l6 blk

Table des Matières