Installation Requirements - Snap-on Equipment JohnBean B600P Manuel D'utilisation

Équilibreuse de roue
Table des Matières

Publicité

142
i-1
Installation
i. Installation requirements
Space requirements
The drawing show the minimum space safety
requirements:
Figure i.1
Each drawing has two sets of dimensions:
1
from the wall to the centre of the holes: on
the left and top of the drawing
2
from the wall to the outline of the cabinet: on
the right and bottom of the drawing
Floor requirements
The fl oor must be:
-
horizontal; +/- 1° tolerance
-
plane; tolerance within 2 mm
-
able to bear the weight of the balancer as stated in
Chapter 2 of the Operator's Manual.
The fl oor on which the balancer will be installed should
not transmit vibrations from other devices or from
outside the building. External vibrations may affect the
accuracy of the unit.
Note: The balancer should be positioned on the
fl oor directly. Do not use spacers to fi ll
gaps.
If the above conditions are satisfi ed, the balancer does
not need fi xing to the fl oor.
Power supply requirements
Refer to Chapter 2 of the Operator's Manual for power
mains requirements.
WARNING: ENSURE THAT AN APPROVED WALL
MAINS OUTLET IS AVAILABLE.
WARNING: NEVER GUIDE POWER SUPPLY
CABLES OVER THE FLOOR, UNLESS PROTECTED
BY AN APPROVED COVER.

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Johnbean b600

Table des Matières