Abicor Binzel ABITIG WH 220WS1 Mode D'emploi page 34

Système de torche de soudage tig
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

6 Putting into operation
Charge the entire cooling system as follows when used for the first time and after every cable
assembly change:
1 Disconnect the coolant return hose (1) from the coolant recirculator (2) and hold it over a
collecting device.
2 Close the opening at the coolant return hose (1) and open it again by repeatedly and
abruptly releasing it, until the coolant is flowing continuously and without air bubbles into the
collecting device.
3 Switch off the coolant recirculator (2) and reconnect the coolant return hose (1).
6.7 Connecting the control lead
1
WH
2
1
Emergency-off
Fig. 5
The control lead is open on the machine side. The customer has to provide the connection of a
suitable plug. If all data are complete, everything will be delivered ready for connection.
Otherwise choose a compatible plug for your power supply and solder it to the corresponding
leads according to the connection diagram.
EN - 14
2
1
3
BN
GN
Connecting the control lead
WH
BN
GN
WH
BN
Sensor
®
ABITIG
WH
BAL.0111 • 2020-01-29

Publicité

Table des Matières
loading

Table des Matières