DINAMIC 1.1
PRIOR OPERATIONS:
• Disconnect the battery.
• Take down the evaporation unit's air distribution
interior panel.
CABIN INTERIOR:
1
Introduce the template supplied and mark
bores.
A- If there are 2 beds, place the template
between the two.
B- If there is 1 bed, place the template on the
bed.
Make through bore Ø4 with long broach in bore
2
position Ø48, and then make the following
bores.
A- make (1) Ø35 in the cover only
B- make (1) Ø19 in the cover only
C- make (1) Ø48 in the cover only
D- make (4) Ø22 in the cover only
UP
1
UP
2D
19
EN
®
UP
Ø48
Ø35
Ø19
UP
Ø48
2
Ø35
Ø19
2C
2D
2A
2B