Table des Matières

Publicité

-
the SKYBOXE/CE track can be fitted to the upper part of the
doorframe or to the architrave just above it (if this lies flush with
the frame), see pos. A in fig. 20;
-
the distance between the SKYBOXE/CE sliding track and the
highest point reached by the overhead door during rotation
(distance X in fig. 22) is at least 1 cm greater than the thickness
of the door.
Install as follows:
-
position the 150BAN in the middle of the door, perfectly
perpendicular and flush with its upper edge (B fig.21). Secure
with 4/6 self-tapping screws;
-
assemble the 150BAN, see pos. C in fig. 21, not forgetting to
replace the curved drilled rod with the straight one;
-
fix the 150BAN to the slide, keeping at a distance of 1 cm from
the longitudinal member (D fig. 20) and sliding the slotted bar
until the holes match the fixing holes (E fig. 21);
1_ Integrate overhead garage door safety in compliance with
current laws.
2_ Choose short routes for cables and keep power cables
separate from control cables.
3_ An external switch should be fitted, in compliance with
European safety standards, in order to disconnect mains
power when servicing the door.
4_ Make sure that each device is in perfect working order.
5_ Put up easy-to-read signs informing people that they are near
a motor-driven door.
It is categorically forbidden to use the equipment for purposes or
in circumstances other than those mentioned herein. Please bear
in mind that this is an electrically powered automatic device which
should therefore be used with caution. In particular:
1_ do not touch the equipment with wet hands;
2_ disconnect the power supply before opening the control box
and/or the gear motor;
3_ do not remove the plug by pulling the lead;
4_ do not touch the motor unless you are sure it is cold;
5_ only operate the door when it is completely visible;
6_ do not approach the door while it is moving: wait until it has
stopped;
7_ do not allow children or animals to play near the door;
8_ do not allow children or unauthorised people to use the remote
control or other control devices;
9_ carry out routine maintenance;
10_
in the event of a fault, disconnect the power supply and
only move the door if it is possible and safe to do so. Do not
attempt to repair the door but call in an authorised technician;
11_
it is forbidden to touch moving parts while the device is
working;
12_
anything not expressly specified in these instructions is
forbidden.
As the performance of the system also depends on the state of
the overhead door, the operations required to keep it in perfect
condition are described below.
Attention: no-one, except for qualified maintenance men, must be
able to use the automatic system during servicing. Switch off the
mains power supply to eliminate the risk of electrocution. If the
power supply must be left on for certain operations, each control
device (remote controls, push button panels, etc.) should be
checked or disabled, except for the one used by the maintenance
man.
Each of the following operations must be carried out when
necessary and always every 6 months (always 750 work cycles).
RECOMMENDATIONS
USE
MAINTENANCE

ROUTINE MAINTENANCE

SKYBOX Series
Door:
1_ Lubricate the hinges.
Automation system:
1_ check the safety devices (photocells, etc.). They must work
properly in dangerous situations and cut in
during installation;
2_ lubricate the chain;
3_ check that the slide way is clean and free from debris;
4_ push the door fully open making sure never to use a force of
more than 150 N (15 kg);
5_ make sure the door moves smoothly;
6_ make sure that the door does not descend when it is stopped
and released at any point;
7_ check that the screw connections are perfectly tight.
FREQUENCY: every 750 manoeuvres or 6 months, failing
which the guarantee lapses.
EXTRAORDINARY MAINTENANCE OR BREAKAGE
If major work on electromechanical parts must be carried out, the
faulty part should be removed and repaired in the workshop by the
manufacturer's or other authorised technicians.
SKYBOXE/CE comprises various types of materials which must be
disposed of in compliance with current legislation.
There are no particular dangers or risks deriving from demolition of
the system. If waste sorting is required, the components should be
grouped by type of material (electrical, aluminium, plastic, etc.).
as configured
DISPOSAL
11

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

SkyboxeSkyboxceSkyboxe100Skyboxce100

Table des Matières