Commissioning, Operation - WIKA Unitrans A-IUR-1 Mode D'emploi

Module d'affichage
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

6. Commissioning, operation

6. Commissioning, operation
6.1 Mounting the indicator module
Loosen the screws
When changing out the display, after pressing in the securing hook, pull
the connection cable out.
Disconnect the retaining string from the transmitter.
Connect the retaining string from the new indicator module to the same
point.
Plug the connection cable into the corresponding socket
Place the indicator module on the transmitter and screw it on.
WARNING!
When placing the indicator module, do not kink or pinch the
connection cable or the retaining string. If the connection cable is
damaged, it may not operate properly and the Ex protection of the
instrument will be made void.
The indicator module can be oriented when mounting by rotating
in 4 x 90° steps.
WIKA operating instructions unitrans
and remove the blind cover or display.
indicator module model A-IUR-1
 .
Connection cable
Retaining string
11
GB

Publicité

Table des Matières
loading

Table des Matières