KERN MCB Mode D'emploi page 87

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

 Carefully insert the rechargeable
battery block and insert plug into
connection CN 3
Ensure that the cables are not
squeezed
 Close the battery cover
If the rechargeable battery is exhausted, „LO" is displayed. The
rechargeable battery is loaded via the provided plug-in power
supply unit (loading time 14 h for a complete loading).
If the balance is not used for a longer time, take out the
rechargeable battery and store it separately. Leaking liquid could
damage the balance.
MCB_MPT-BA-e-1619
31

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Mpt

Table des Matières