INSTALLATION
For devices with a detachable power cord, use an
easily accessible power socket in the vicinity of the
machine.
For installation and startup of the machine you need
a qualified electrician to connect the machine to a
three-phase electrical line in your company.
The KOBRA Model SSD is supplied fully wired and
comes with a 4-core+earth cable for the versions
380-415V, and a 3-core+earth for the versions 208V
(USA,CANADA).
Current requirement for 380-415 Volt units is 32
Amps.
Current requirement for 208 Volt units
(USA/CANADA) is 50 Amps.
Connect a standard plug of the kind normally used
in the country where the device is to be installed.
Plug the power cable of your KOBRA Model SSD into
the mains.
NOTE
The mains system the KOBRA Model SSD is plugged
into must be fitted with a differential circuit breaker
to protect the primary circuits from ground faults.
There is a main switch on the control panel of your
device, turn the lever from the "0" position to "1"
and check that the "STAND-BY" light on the control
panel comes on, press the FORWARD button on the
control panel.
Now your disintegrator is in operation.
Warning!! Carry out a visual check by removing the
inspection window on the right hand side of your
disintegrator to make sure that the cutting knives are
rotating in a clockwise direction as in the diagram.
If the cutting knives are rotating in the opposite
direction to that shown in the diagram, get a
QUALIFIED ELECTRICIAN to modify the sequence of
the R-S-T cables on the power plug of your device.
The KOBRA model SSD can be positioned in an area
within 4 metres of a wall socket.
Make sure to position the machine 80/100mm from
the wall to guarantee proper ventilation.
27