dirna Bergstrom TRP DYNAMIC Instructions De Montage page 19

Masquer les pouces Voir aussi pour TRP DYNAMIC:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

DYNAMIC
PRIOR OPERATIONS:
!
• Disconnect the battery.
• Take down the evaporation unit's interior
air distribution panel.
1
INSIDE THE CABIN:
Position the template supplied and mark the
boreholes.
A- If there are 2 bunks, position the template
above the one chosen to install the unit.
B- If there is 1 bunk, place the template
above the bunk.
2
Make through bore Ø4 with long broach
in bore position Ø48, and then make the
following bores.
A- make (1) Ø35 in the cover only
B- make (1) Ø19 in the cover only
C- make (1) Ø48 in the cover only
D- make (4) Ø22 in the cover only
UP
1
UP
2D
19
EN
®
UP
Ø48
Ø35
Ø19
UP
Ø48
2
Ø35
Ø19
2C
2D
2A
2B

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

1541268

Table des Matières