Maintenance Schedule - Varan Motors WY1P70FV-2 Manuel D'utilisation

Moteur à essence
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

.MAINTENANCE SCHEDULE

To keep the engine in a sound condition , the user should maintain it according to the table
below:
Frequency
Oil level check
Engine
Replace
Check
Air cleaner
Clean-replace
Deposit cup
Check-clean
Check , clean,
Spark plug
Throttle valve
Check-adjust
Valve clearance
Check-adjust
Idle
Check-adjust
Fuel tank &
Clean
fuel filter
Fuel supply line
Clean-replace
NOTES :①
√ is used for 1P61FV and 1P65FV , for 1P70FV.
②More often than that in the schedule if in dusty circumstances.
③The items should be done by your dealer unless you are specially trained and is well equipped with
tools.
WARNING
Stall the engine before service . If service is required with the engine funning , be sure to keep
good ventilation in the area , The exhaust emissions from the engine contain toxic carbon monoxide ,
inbreathing of it may do harm to personnel and even result in death of personnel.
.METHOD
Replacement of Engine Oil
A still hot engine is helpful to drain out the engine oil in the crankcase rapidly and entirely.
a) Turn off the oil filler cap and drain plug to drain engine oil thoroughly . Reinstall the drain
plug and screw in securely.
b) Fill the specified engine oil to the upper level mark.
c) Reinstall the oil filler cap
NOTE
Do not dump oil containers or discarded engine oil into rubbish boxes or onto the ground. For the
sake of environmental protection , we suggest you take in discarded engine oil with a closed container
and bring to local recycling station.
Service of Air Cleaner
A dirty air cleaner may block enough air's flowing into the carburetor . To keep the carburetor in
good working conditions , please service the air cleaner periodically . If operation the engine in
extremely dusty area , the job should be done more often.
MAINTENANCE
Each
time
5.hr.
√△
√△
√△
adjust
First month
Each season
25.hr.
25.hr.
√△ Every two years(do a replacement if necessary)
30
Every 6-month
50.hr.
100.hr.
150.hr
√△
Each year
or 300.hr.

Publicité

Table des Matières
loading

Table des Matières