LIGHT
Connect directly to the M6 output of the PCB. Can be switched off or on from the front
control panel of the electrical box.
M6
K1
E5
SAT
OTHER ELECTRICAL CONNECTIONS
• Connect the three level sensors supplied with the balance tank directly to the M9 input
of the PCB.
• Connect ozone wire directly to the grid 5-6 input of the electrical box.
• Connect the electric control box to the power supply.
ATTENTION
Make sure all the hydraulic and electrical / electronical connections are done
before connecting the electric control box to the power supply. It is mandatory
to use packing glands for all the connections coming out of the cabinet and
the junction box. It is mandatory to use terminals in all connections in order to
preserve the integrity of the leads.
3.6. Hydraulic connection
KIT INSTALLATION
The compact kit must be below the Spa level. This avoids having to prime the pumps. The
maximum difference in level is 2 metres below (h ≤2m).
30
V1
J4
V1
F6
2SAT
M6
h
2m
≤
121
122