2.3.1 Malt Pipe Assembly Outside the Brew Monk
Step 1
Place male thread connector (E) through bottom malt screen (B) and attach with the nut (D).
Step 2
You can adapt the overfl ow pipe according to the amount of malt recommended for your
recipe. For that adjust the telescopic pipe (E) to the desired height.
Step 3
Connect 2 handles (C) to the top malt screen (A).
Instruction Manual Brew Monk - EN
29