Télécharger Imprimer la page

Kohler K-8359 Guide D'installation page 8

Publicité

Standoff Rod
Locknut
Spout Base
5. Install the Spout
Remove the plaster guard from the supply tube.
Slide the spout over the supply tube.
Adjust the height by loosening the lock nut and rotating the base
as needed.
Thread the standoff rod out of the mounting base and into the
spout by hand.
Check for proper fit following the diagram above.
Trace the spout base on the rough floor with a pencil. The circle
serves as the floor rough-in guide.
Tighten the lock nut and thread the standoff rod back into the
mounting base.
Remove the spout and standoff rod.
Replace the plaster guards.
1006092-2-B
All manuals and user guides at all-guides.com
Water
20-1/2"
(52.1 cm)
3-1/4" (8.3 cm)
8
2-1/4"
(5.7 cm)
Kohler Co.

Publicité

loading