The number of persons required for installation: 1 adult at least.
3.3. Assembling
1) Lay your spa outer liner out in the
selected area.
4) Add the other foam wall segments.
7) Pull out the 3 connectors in the liner
at the holes provided for the purpose.
10) Smooth the liner all around the
spa to ensure a good fit.
Warling : Do not leave spa unattended while filling with water.
Make sure the drain fitting is plugged securely and the cap is in place. Start filling the spa with water. After
about 1-inch of water is on the bottom, stop filling and smooth wrinkles out of the bottom of the spa. Pull
the outer wall out from the top edge, all around the bottom of the spa, so that it fills evently.
15 minutes for site preparation and water filling.
2) Add the foam wall segment with the
three holes in it for connection to the
base liner.
5) Adjust the 8 segments until they
form a perfect round shape. Then,
ensure that the holes for the outer liner
connection and the holes in the foam
wall are still aligned.
8) Smooth the liner all around the spa
to ensure a good fit .
11) Locate the place where the two
zippers are aligned, connect them and
start to zip the two parts together.
Continue filling the spa until waterf level.
3) Ensure that the three connection
holes in the foam wall are aligned
with the three connection holes in the
outer liner.
6) Insert the inner liner of your spa.
9) Make sure that the zippers of the
inner and outer liners are aligned
before zipping them up.
12) The two parts must be fully zipped
up.
EN
29