Télécharger Imprimer la page

Fulgor Milano F7SP24 1 Serie Instructions D'installation page 10

Publicité

Installation Instructions
EN
Final Checklist
To prevent improper connections leading to damage of electrical
components and so voiding the warranty, the following steps must be
performed:
1.
Check the electrical requirements and make sure you have the
correct electrical supply and that the oven is properly grounded.
2. Turn on the power supply to the oven.
3. Check power at the junction box wires using a voltmeter having a
range of 0-250 VAC.
4. If you have installed the oven for use on 240 Volt supply, you
should find that the voltage reading between the black and red
wires (Line to Line) should be 220 to 240 Volts.
5. If you have modified the oven(s) for use on 208 Volt, the voltage
reading between the black and red wires should be 190 to 208
Volts.
6. Test the oven mode. Select the
Care Manual for detailed operation instructions.
7.
Verify that the oven light comes on and the oven begins to preheat.
8. Test the door lock. Set the
door locks when the lock icon appears in the display.
9. To check the other oven functions refer to the "Using the Oven
Controls" section of the USE AND CARE MANUAL.
10. If the oven is working properly, turn off the power supply to the
oven.
1 1. Place the cover on the junction box and make sure the cover is
securely fastened and turn on the power to the oven.
Leave these INSTALLATION instructions as well as the USE AND CARE
MANUAL with the owner.
8
mode. See the Use and
BAKE
SELF CLEAN
mode. Confirm that the

Publicité

loading

Ce manuel est également adapté pour:

F7msp24 1 serie