Télécharger Imprimer la page

TBH LN Serie Manuel De Fonctionnement Et De Maintenance page 64

Masquer les pouces Voir aussi pour LN Serie:

Publicité

3
4
5
7
1
TFS500 / 1000
1
Inlet opening
2
Compressed air supply for filter cartridge cleaning (observe specification).
3
Control panel
4
Exhaust air opening (on FPV series systems: connection for the downstream extraction system)
5
Power supply, interface
6
Compressed air tank
7
Filter housing with saturation filter / filter cartridge
8
Dust collector
9
Wheels / machine foot / anti-tipping device depending on type of system
4.4
Startup
• First perform the steps in the "Installation" section.
• Make sure that the system is stably positioned, and check the piping.
• Check that the system is correctly connected to the power supply. The 400 V power supply must have a neutral
wire (because the system operates with 230 V control voltage). Pay attention to the rotary field when making the
connection.
• All filters in the system must be installed properly.
• Use the power switch to switch on the system.
• The display on the front of the system starts after a slight delay (self-test).
• The system starts automatically. When using the interface, the interface's signal takes precedence.
• The speed of the turbine or the fan can now be changed using the +/- buttons or via the interface.
• In case of problems when starting up the system, see Sections 5 and 7.
All manuals and user guides at all-guides.com
4 Installation, Initial Operation
9
64-236
1
7
5
3
4
9

Publicité

loading

Ce manuel est également adapté pour:

Gl serieLn230Ln260Ln265Gl230Gl265 ... Afficher tout