Télécharger Imprimer la page

VEVOR B35IM Mode D'emploi page 9

Publicité

Drainage operation
1. After continuous operation for 5 hours, it is recommended to remove all
the water in the water system and recharge the new water
2. Press the drainage cover buckle pointed to by the arrow, take out the
drainage cover, built-in drainage pipe, pull out the drainage pipe, after the
drainage is completed
Put the drain pipe back in place to avoid water leakage from the next
water injection.
▲ kindly reminder! For the health of you and your family, please use wet
soft cloth before / after
Simple Fault Analysis
Advice: If abnormal situations cannot be resolved through a simple fault
analysis, please get in touch with professional customer service for
assistance.
Car Refrigerator Does Not Work
1.Check if the power is connected correctly. (check If the plug is loosened
or positive and negative poles are reversed).
- 8 -

Publicité

loading